OPERATION GUIDE (Example shown is for lock mortice holes).

(Note: These images are for the purposes of a basic demonstration only - the unit MUST be securely mounted into/onto your workbench before operation).


MARK THE CENTRE POSITION FOR YOUR LOCK ON THE FACE OF THE EXTRUSION.


SLIDE THE EXTRUSION INTO THE PUNCH GUIDE AREA. MAKE SURE THE CENTRE RIB IS TOWARDS THE FRONT.


LINE UP THE CENTRE MARK WITH
THE FIRST MARK ON THE TOOLING.


HOLD THE SECTION FIRMLY AND
PRESS THE FOOT PEDAL.



REPEAT THIS PROCESS 3 TIMES TO ACHIEVE A 160MM LONG HOLE.



USING PLIERS, REMOVE THE
SLUGS FROM THE NEW LOCK HOLE.


SLIDE THE EXTRUSION OVER THE
HORN OF THE PUNCH FOR THE NEXT OPERATION AND PRESS THE FOOT PEDAL AGAIN.


REMOVE THE EXTRUSION AND CLEAR
THE SLUGS FROM THE UNIT.


TURN THE EXTRUSION OVER AND
REPEAT FOR THE OTHER SIDE.


COMPLETED JOB READY FOR LOCK INSTALLATION.
   

   

BACK TO TOP


© 2003 - Universal Fluid Power Pty Ltd [ HOME PAGE ]